Fast Rebuild on Narrow Plots

Choosing a structural system that least affects neighbours and rent support after a risky-building decision on a narrow plot.

Related service: Urban Renewal Steel Frame

The problem

In urban renewal the plot is narrow, the street is narrow and the neighbours are close. On a concrete site, formwork, rebar, pouring and curing take months; every month means rent support, neighbour complaints and logistics trouble.

The real question for owners is: how can site time be shortened and planned from the start?

Comparison

CriterionSteel constructionReinforced concrete
Site timeFrame is fabricated in the workshop; site assembly is dryFormwork, pour and curing repeat floor by floor
Logistics on narrow streetsPrefabricated members arrive in planned deliveriesMixer and pump traffic peaks on pour days
Schedule predictabilityFabrication and assembly schedule is fixed at design approvalWeather and curing time affect the schedule
Structure weightLighter frame, lower foundation loadHeavier structural system

Advantages

  1. Short site time

    The frame is fabricated in the workshop while foundations are under way.

  2. Predictable schedule

    Fabrication and assembly dates are set at design approval.

  3. Less neighbour disruption

    Dry assembly; no concrete pour, no curing wait.

  4. Code-compliant design

    The structural design to TBDY 2018 and the Steel Structures Regulation is submitted at the permit stage.

Technical basis

Design follows TBDY 2018 (Turkish Building Earthquake Code) and the Steel Structures Design and Construction Regulation. Connections are bolted or welded as designed; welded fabrication takes place in the controlled workshop environment. Fire and corrosion protection is specified as paint, galvanising or cladding according to project requirements.

Ask for a schedule for your plot

With your plot details and preliminary design we prepare a fabrication-assembly schedule and a quote.