CLK Yapı Group

Loading page

Pelitli Compost Waste Storage Facility

Steel structure design and fabrication for a 900 m² compost waste facility with a mezzanine floor in Pelitli, Gebze, Kocaeli — 87 tons of steel used.

Location
Pelitli, Gebze / Kocaeli
Client
Gebze Belediyesi
Area
900 m²
Tonnage
87 t
Started
May 2026
Completed
July 2026

Steel structure design and installation for a 900 m² compost waste storage facility in Pelitli, Gebze, Kocaeli. A mezzanine floor inside the facility was also designed as a steel structure. Sections were sized to TBDY 2018 and the Steel Structures Code. A total of 87 tons of steel was fabricated and erected for the project.

Planning a similar project?

Tell us about your plot and target schedule; we will prepare a tailored timeline and quote.

Get a quote